管家婆22422论坛
logo.jpg 管家婆22422论坛
EN 中文

24 hours Hotline

400-6352-668

管家婆22422论坛
管家婆22422论坛

TS-32 SBS Modified Asphalt Root-resistant Puncture Waterproof Membrane

Product overview

SBS modified asphalt root-resistant waterproof membrane is a kind of modified asphalt coiled material with long fiber polyester fiber felt or copper filler as the base material, SBS modified asphalt added imported chemical radical inhibitor as coating material and both sides covered with polyethylene film as isolating material.

Order Hotline:400-6352-668

Product performance

* It has excellent waterproof property, can form high strength waterproof layer, has strong resistance to pressure water, and keeps waterproof effect for a long time.

* It has the function of preventing the penetration of fabric root system, and can withstand the puncture of plant root system, which can prevent root puncture and do not affect the normal growth of plant.

* High tensile strength, corrosion resistance, mold resistance and weather resistance.

* It has excellent high temperature resistance, strong adaptability to shrinkage, deformation and cracking of the base, and is suitable for both cold and hot areas.

* Hot melt construction, easy construction and durable for the hot joint.

 

Classification and specification

* According to the type of root resistance is divided into chemical root resistance and physical root resistance.

* Nominal width: 1000mm

* Nominal thickness of polyester felt : 4.0mm,  5.0mm

* Nominal area of each coil : 7.5, 10.

The specifications are as follows

 

Nominal thickness/mm

            4.0

            5.0

Nominal width/mm

           1000

           1000

Type of root resistance

chemical

 physical

 chemical

 physical

Nominal area(/roll)

            7.5

             7.5







Construction technology

* Base treatment: the base must be flat, dry, moisture content ≤ 9%, and then with cold base oil evenly brush the base surface, until it is dry before the construction.

* Roll laying sequence: laying from high to low, the same height first far then near, the same plane begin go laying from the low.

Laying method:

1: Hot-melt method: with a flame gun or other heating tools to heat the bottom side and the base of the rolling material evenly, when the surface asphalt begins to melt to black .and bright, lay the material while baking and compacting it with the press roll. Meanwhile, adjust the size and speed of the flame, the asphalt temperature is kept between 200-250℃. When the construction is completed, use the cold tackifier is used to seal the lap edge.

2: Cold bonding method: using rubber scraper to evenly coat polymer modified asphalt adhesive or cold adhesive such as cold resin on the surface of the base, and controlling the thickness is even, while laying the coil with a rubber stick removing the air and with compaction. When the ambient temperature is less than 15, the hot melt method should be used to deal with the lap position and the coil head position.

* Lapping treatment: when long side lap, single layer waterproof vertical and horizontal lap width≥100mm, double layer waterproof should be ≥80MM; short side lap, single layer should be ≥150, double layer should be ≥100. At the same time, the paste should be uniform and coating or melting can’t be missed . There should be a small amount of extra hot asphalt or cold adhesive to be extruded and formed into strips.

* Inspection and acceptance: after the completion of construction, a thorough inspection should be carried out to ensure that the waterproof surface has no drum, wrinkles, shedding and large shell lifting, to make it smooth and beautiful, so as to ensure the waterproof life of the rolled material.

* Waterproof layer protection: protective layer should be made according to the  <<Technical specification for roofing engineering >>.

 

Executive Standard

<<Elastomer Modified Asphalt Waterproof Membrane>>GB 18242-2008

<<Planted roof Root-resistant Puncture Waterproof Membrane >>JC/T1075-2008

 

 Matters need attention

* Construction is strictly prohibited on rainy and snowy days and above the 5 grade gale.

* The temperature of the construction environment can’t be lower than 0.

* When precipitation occurs during construction, the protection of the coiled material should be done well.

* The distance between the nozzle of the flame heater and the surface of the coil shall be moderate, the heating inside the width should be uniform. Melt the coil surface to the bright black, and the coil shall not be overheated.

* Construction site safety protection facilities are complete, and put according to the provisions of fire equipment.

 

 Application Range

* Suitable for planting roof, roof garden, garage roof and roof of underground buildings that need greening

 

Transport and storage

* The coil should be stored in a dry and ventilated environment, and protective measures should be taken to avoid sun and rain.

* During transportation, products of different types and specifications should be stacked in categories and can’t be mixed up; far from heat sources, no contact with acid, alkali, oil and organic solvents.

* During transport, it should be placed horizontal or vertical to prevent tilt, pressure and if necessary, cover with felt cloth.

* Storage temperature not exceeding 45, height of amplifier not exceeding 5 layers.

* Under normal storage and transportation conditions, the storage period is 12 months from the date of production. Once exceed the storage period, the products can also be used normally after passing the inspection.

 

TS-32 SBS 改性沥青耐根穿刺防水卷材.jpg

法律声明

法律声明法律声明法律声明法律声明法律声明法律声明法律声明
x

隐私保护

隐私保护隐私保护隐私保护隐私保护隐私保护隐私保护隐私保护
x
x