TS-501A Interior wall environmental putty is made of high strength silicate-free materials, fine aggregates and polymer additives, to ensure that the wall and paint surface are dry, natural texture, and can completely reflect the decorative effect of the paint.
Packaging Label: Economy, Environmental Protection, Air Permeability, Moisture-proof.
Product characteristics
Excellent weather resistance, suitable for various changes in the outdoor environment; excellent construction performance, easy to batch and grinding, exquisite; excellent water resistance, moisture-proof, breathable, high bonding strength.
Application range
Paint Base Ash Suitable for New and Old Internal and External Wall Construction
Usage method:
1. Base treatment: base surface should be stable, clean, flat, no peeling, no empty drum, no pulverization, no dust, grease, abscission and other debris; if base surface is too dry, please wet first;
2. Material stirring: According to the proportion of putty powder: water is 100:36~38, water is first poured into the mixing barrel, then powder is added, and electric stirrer is used to stir into a paste without powder particles. Stir again after 2 to 3 minutes, then can be used.
3. Construction technology: Putty spatula is used to apply slurry evenly on the base surface. Generally smear 2 to 3 times. The second coat should be done after the first coat is dry; the last coat can be polished after 1 day. After about 5 to 7 days, the surface coat construction can be carried out. If early construction is needed, alkali-resistant primer should be used.
Transportation& Storage
This product is non-flammable and explosive material. It can be transported according to general cargo. It should be sunscreen, freeze-proof, rain-proof, extrusion and collision-proof in transportation, and keep the package intact.
The product should be sealed in a ventilated, dry and cool place. The storage temperature is +5℃~+40℃.
Under normal storage and transportation conditions, the storage period shall be at least 12 months from the date of production.
Attention
1. This product is suitable for use in the environment of 5-40℃. Do not mix the dried slurry with water for reuse.
2. Verticality and smoothness of the base material must be confirmed before construction. After 24 hours of paving, it can be stepped in or filled in.
3. Should avoid long-term contact with the skin, avoid large amounts of dust inhalation and pay attention to eye protection, if inadvertently into the eye, please see a doctor in time.
Performance parameter
Reference Dosage: 2-5kg/㎡
Initial setting time: ≤2hours
Final setting time: ≤72hours
Construction temperature: +5℃~+40℃
Packaging: 20kgs/package
Implementation standard: JG/T 298-2010&GB18582-2008, specific indicators see technical parameters.
Project | Technical index | ||
State in Container | Non-caking and even | ||
Constructability | Barrier-free scraping | ||
Dry time(Surface dry)/h | single track construction thickness/mm | <2 | ≤2 |
Crack Resistance of Initial Drying (3h) | No crack | ||
Sanding property | Manual grinding | ||
Water resistance | 48h without bubbles, cracking and obvious powder dropping | ||
Bond strength/Mpa | Standard condition | >0.5 | |
After immersion | >0.3 | ||
Volatile Organic Compounds Content(mg/kg) | ≤15 | ||
Total of benzene, toluene, ethylbenzene and xylene(mg/kg) | ≤300 | ||
Free toluene(mg/kg) | ≤100 | ||
Soluble heavy metals(mg/kg) | Pb | ≤90 | |
Cd | ≤75 | ||
Cr | ≤60 | ||
Hg | ≤60 | ||